1 / 5
| 1. | Fruit Paste processing line |
| 2. | Fruit puree processing line |
| 3. | Fruit juice processing line |
| 4. | Fruit drinking production line |
| 5. | Fruit pulp making line |
| 6. | Fruit beverage production line |
| 7. | Vegetable Juice & Vegetable Puree production line. |
| Processing capacity | 12 Ton/day - 5000 Ton/day. |
| Automatic level | High Automatic or as per customer's requirements |
| Material | Food grade SUS 304 or SUS 316 stainless steel |
| Juice yield | Up to 95% |
| Service scope | Turnkey solution project (Machinery processing, design, installation, debugging, training and after-sale service) |
| 1 | Bucket Elevator: Smooth bucket structure against clamping fruits; Running stably with low noise; speed adjustable by transducer; Anticorrosive bearings. |
| 2 | Air Blowing & Washing Machine: Special design of surfing and bubbling to ensure thorough cleaning and lessen damage to fruit; Suitable for tomatoes, strawberry, mango, etc. |
| 3 | Peeling, Pulping & Refining Monobloc: Can peel, pulp and refine fruits together; adjustable strainer screen aperture; High quality stainless steel contact parts. |
| 4 | Belt Press Extractor: High extraction rate (75-85%); big press efficiency; high degree of automation; easy to maintain. |
| 5 | Preheater: Inactivates enzymes and protects the color of the paste; Auto temperature control; Multi-tubular structure. |
| 6 | Evaporator: Adjustable and controllable direct contact heat treatment; Shortest residence time; Efficient separator design. |
| 7 | Tube in Tube Sterilizer: Consists of receiving tank, pumps, tubular heat exchanger, PLC control; Adopt mirror welding tech; CIP and auto SIP available. |
| 1 | Juice production line: Orange, grape, coconut milk, pomegranate, watermelon, peach, mango, exotic fruits, carrot, etc. |
| 2 | Canned food production line: Canned mushrooms, chili sauce, paste, peaches, oranges, apples, pineapples, green beans, etc. |
| 3 | Sauce production line: Mango sauce, strawberry sauce, cranberry sauce, hawthorn sauce, etc. |
Thorough analysis of your requirements to develop customized solutions with transparent implementation steps.
Calculating time frames and resources, defining milestones to ensure successful investment realization.
Close cooperation between mechatronics, control engineering, and software development specialists.
On-site installation by the same engineers who developed the project to guarantee a smooth set-up.







